The post Safety functions of Dong Duong Elevator company appeared first on Thang Máy Đông Dương.
]]>2-way set control
The system fully automatically responds to all calls to call in 2 directions of travel (upward and down direction)
The system can only respond to call of stairs to go down at floors.
Lights and fans in the elevator room will automatically turn off when the ladder is inactive or a certain period of time.
When the elevator reaches the floor, there will be an alarm when the elevator stops
When the door of the staircase is closed, the passenger can open the door by pressing the outside call button again.
After a period of time if there is no user, the ladder will automatically close.
Waiting time from door fully open until closed, adjusted automatically when receiving call signal inside and outside the stair room.
When not in use for a period of time, the elevator will automatically return to the main floor. The time period is adjustable.
When receiving the fire alarm the lift will automatically returns to the ground floor, open the passenger door. Then the lift will open the waiting door and will not work. The wire of the fire alarm system is supplied by the owner to the elevator’s control cabinet.
When this mode is opened, the elevator only serves commands in the staircase, does not respond to calls outside the floor
Set up in the control system to avoid false overload create ignition of the engine.
This controller allows you to select the nearest elevator when there is a signal to call the elevator to save time waiting for the elevator during peak hours, save energy without need set.
If one cabin cannot accommodate all waiting passengers at the same time, another cabin will be taken to serve the remaining passengers.
The post Safety functions of Dong Duong Elevator company appeared first on Thang Máy Đông Dương.
]]>The post Steps for Maintenance activities appeared first on Thang Máy Đông Dương.
]]>| VỊ TRÍ | CÔNG TÁC KIỂM TRA | |
| PHÒNG MÁY | Môi trường phòng máy: | – Đảm bảo sạch sẽ, thông thoáng, phải có cửa và khóa.- Đảm bảo không bị mưa tạt, nhiệt độ đảm bảo trong khoảng 5-40oC
– Có đèn chiếu sáng. |
| Nguồn cung cấp | – Hộp CB chính được cố định chắc chắn. CB phải có khả năng đóng vầ cắt an toàn, các vít bắt đầu dây phải tiếp xúc tốt (không bị cháy, nám)- Dung sai điện áp nằm trong giới hạn cho phép ±5%
– Điện trở tiếp đất ≤4 (Ohm) |
|
| Cụm Motor – máy kéo | – Kiểm tra hoạt động máy kéo và âm thanh bất thường của động cơ.- Mức dầu bôi trơn đúng tiêu chuẩn, không bị rò rỉ.
– Khe hở giữa bố thắng và tang thắng từ 0.02 đến 0.05mm; lực thắng hai bên phải bằng nhau. – Puly ma sát trên máy kéo mòn đều nhau giữa các rảnh cáp và bảo đảm cáp không chạm đáy rãnh. – Kiểm tra cử chặn cáp trên máy hở với dây cáp 2 đến 3mm. |
|
| Cáp tải | – Kiểm tra, vệ sinh cáp, có cần thiết thay cáp.- Đối với cáp chéo (ESW) thì đảm bảo các nhánh cáp không bị cọ sát với nhau.
– Vạch sơn đánh dấu trên cáp và trên bệ máy phải dễ dàng nhận thấy |
|
| Puly chuyển hướng | – Kiểm tra hoạt động của puly, không có tiếng kêu bất thường; kiểm tra các đai ốc đĩa cố định trục pu-ly (2 đai ốc siết chặt vào nhau và có chốt bi).- Kiểm tra độ mòn các rãnh (đảm bảo đều nhau). | |
| Encoder | – Đảm bảo đồng tâm với trục vít; dây tín hiệu phải cố định gọn gàng. | |
| Tủ điện | – Cửa tủ và vách sau tủ được lắp hoàn chỉnh, Các nắp máng dây điện trong tủ đậy kín và đúng thiết kế.- Dây điện trong tủ phải gọn gàng (nhất là các thiết bị lắp thêm nếu có)
– Vệ sinh bên trong và bên ngoài tủ. |
|
| Bộ giới hạn tốc độ | – Kiểm tra các ổ bi.- Kiểm tra bánh xe cần lắc (Bánh xe cao su lăn trên cam)
– Kiểm tra rãnh puly Gov. – Kiểm tra cáp Gov. – Kiểm tra sự tác động của Switch. – Kiểm tra bao che Gov. |
|
| NÓC CABIN | Môi trường nóc cabin | – Kiểm tra khung an toàn trên nóc cabin.- Kiểm tra đèn chiếu sáng trên nóc cabin.
– Kiểm tra hệ thống dây điện trên nóc cabin – Vệ sinh nóc cabin |
| Shoe trên cabin | Các khe hở shoe và độ mòn cho phép của hàm shoe | |
| Hộp nhớt bôi trơn rây | Kiểm tra tim hộp nhớt và mức nhớt | |
| Thắng cơ | Kiểm tra hệ thống tay giật thắng cơ, hộp SOS | |
| Ty cáp; puly đầu cabin | Kiểm tra hệ thống tay giật thắng cơ, hộp SOS | |
| Cáp GOV | Kiểm tra 2 đầu cáp governor | |
| Hộp UD | Hộp phải được đậy nắp an toàn, các button hoạt động bình thường | |
| Hộp móng ngựa | Vệ sinh sạch sẽ, ăn khớp vào lá cờ 25±2 mm và ngay giữa rãnh hộp | |
| GIẾNG THANG | Môi trường giếng thang | Được che chắn an toàn, chống thâm nước, chiếu sáng đầy đủ |
| Shoe đối trọng và hộp nhớt | – Kiểm tra shoe đối trọng: cho phép khung có thể lắc qua lại max. 5mm và lắc ngang dưới 3mm- Hộp nhớt bôi trơn rây đối trọng: châm nhớt và kiểm tra tim nhớt. | |
| Đầu cáp đối trọng | Kiểm tra đai ốc, chốt bi. Kiểm tra tình trạng các cao su ty cáp; kẹp cáp, kẹp gỗ. | |
| Dây điện dọc hố | – Kiểm tra, siết lại đầu dây cáp cho căng; Cố định chắc chắn ống PVC.- Vệ sinh các mối nối dây trong hố. | |
| Tay cờ; lá cờ | Kiểm tra và cố định chắc chắn. | |
| Tay giới hạn; hộp giới hạn | Kiểm tra và định vị chắc chắn. | |
| Ray cabin, ray đối trọng | Vệ sinh sạch sẽ; Kiểm tra, siết lại các bulong kẹp rây, bulong nối rây. | |
| HỐ PIT | Môi trường hố PIT | Vệ sinh sạch sẽ, đảm bảo khô ráo, ánh sáng đầy đủ. |
| Cầu thang | Có cầu thang đảm bảo an toàn và chắc chắn. | |
| Buffer đối trọng | Kiểm tra khoảng hở đảm bảo an toàn, tăng cáp khi cần thiết. | |
| Buffer cabin | Kiểm tra khoảng hở đảm bảo an toàn, sửa chữa hoặc thay thế khi cần thiết. | |
| Dây cordon | Kiểm tra và khắc phục nếu dây cordon bị va chạm vào các thiết bị khác. | |
| Đối trọng Governor | Kiểm tra và hiệu chỉnh các bát kẹp, cáp GOV. | |
| CỬA TẦNG | Sill cửa và yếm che sill | Kiểm tra độ cong, vênh,¼, vệ sinh sạch sẽ. |
| Guốc cửa | Kiểm tra độ lắc ngang của guốc. | |
| Bánh xe cửa | Kiểm tra sự nguyên vẹn của các bánh xe. Kiểm tra độ ma sát. | |
| Rây cửa | Kiểm tra độ mòn, vệ sinh sạch sẽ. | |
| Cánh cửa | – Kiểm tra, hiệu chỉnh, đảm bảo không bị lệch, không có khe hở và phải cao đều bằng nhau.- Doorlock và tiếp điểm:
– Móc khóa an toàn. – Tiếp điểm tiếp xúc tốt – Không có va đập khi đóng mở. |
|
| Chìa khóa cửa tầng | Bảo đảm mở được cửa từ bên ngoài bằng thanh gạt hoặc chìa khóa chuyên dụng. | |
| Bảng điều khiển tầng | Kiểm tra kỹ các đèn báo chiều, báo tầng, các nút nhấn, ổ khóa thang. | |
| PHÒNG THANG | – Kiểm tra đèn báo khẩn cấp.- Kiểm tra hoạt động của Quạt thông gió và đèn, vệ sinh sạch sẽ.
– Kiểm tra hoạt động của điện thoại nội bộ, chuông khẩn cấp. – Kiểm tra hoạt động của thiết bị bảo vệ cửa. – Kiểm tra cửa cabin: đảm bảo không bị cong vênh, cánh cửa đóng mở êm, đều nhau. – Vệ sinh nóc phòng thang. |
|
The post Steps for Maintenance activities appeared first on Thang Máy Đông Dương.
]]>The post Management measures to ensure the quality of construction equipment in accordance with Vietnamese Standards appeared first on Thang Máy Đông Dương.
]]>For imported equipment and materials of the elevator, after being imported, completing the customs procedures will be transferred to the warehouse at the factory. Then when all other materials and equipment are completely manufactured, they will be transported to the site at the same time to prepare for installation.
When materials and equipment are delivered to the site, they will be gathered in the warehouse. Warehouse at the site will be taken care of and preserved by the employees of Indochina Elevator Company (warehouse must ensure shading and rain shading conditions).
In the process of construction and installation, we will establish a management board to operate and supervise the related works at the site according to the organization chart and staffing at the site.
With specialized installation equipment for elevators and a team of skilled workers who have installed many types of elevators in Vietnam, we will complete the installation of the elevator according to the correct process, ensuring safety. in the shortest time.
After completing the installation, the elevator will be operated, checked and calibrated by the company’s many years of experience in charge.
The engine will be inspected and issued a certificate of eligibility for safe use by the Technical Inspection Center of Occupational Safety for the user.
Before handing over to the user, we will assign technical staff to guide and train the rescue operations in case of an emergency.
The post Management measures to ensure the quality of construction equipment in accordance with Vietnamese Standards appeared first on Thang Máy Đông Dương.
]]>The post Duong Duong strictly implements measures to ensure labor safety, fire prevention and environmental protection during construction appeared first on Thang Máy Đông Dương.
]]>ENVIRONMENT PROTECTION
Due to the unique installation problem of the elevator is to only assemble the ladder in the pit area (limited to a small scale). The equipment has been manufactured synchronously, and the devices do not carry any other harmful properties, so the impact on the environment is very small and insignificant.
OCCUPATIONAL HEALTH AND SAFETY
Occupational safety is one of the goals that our Company has always been interested in, so all employees of the Company are required to undergo a training course on occupational safety regulations. and during the construction on site must strictly comply with the labor safety regulations and the elevator installation procedures, as well as the general rules of the site.
After conducting a field survey on the ground, current conditions of underground works, electrical systems, the location of the ladder. Labor safety measures in the construction work will include:
All safety issues will be closely monitored by site supervision. All violations will be corrected and handled immediately by the management board.
The post Duong Duong strictly implements measures to ensure labor safety, fire prevention and environmental protection during construction appeared first on Thang Máy Đông Dương.
]]>The post Construction and installation measures to limit the loss of Dong Duong Company appeared first on Thang Máy Đông Dương.
]]>Gathering equipment
All materials and equipment constituting the elevator after being imported or processed will be gathered at the site to prepare for installation. The equipment is neatly packed for convenience during transport as well as to avoid damage during transportation
Warehouse
After being transported to the site, all equipment will be loaded into storage in case there is a warehouse on site. If there is no warehouse, we will negotiate with the investor to choose the convenient equipment gathering place for construction. Equipment maintenance will be handled by our company’s staff.
Construction work
After handing over the pit, we will use the elevator oit at its sole discretion to carry out the installation. During the installation, in order to ensure occupational safety and convenience in installation, we will not allow any other unit to work within the pit. If there is another unit under construction related to the pit, there must be a discussion and our consent.
At the construction, we will establish a management board in charge of installation and solve all problems related to the construction process.
The process of construction of each ladder will be carried out in the following order:
The post Construction and installation measures to limit the loss of Dong Duong Company appeared first on Thang Máy Đông Dương.
]]>The post The process of installing the elevator according to strict standards appeared first on Thang Máy Đông Dương.
]]>During the construction and installation process, the entire construction site is limited to the pit area, so it does not affect other works.
The order of installation is as follows:
Step 1: Materials are transported to the site and then gradually transferred into the pit, including equipment such as rail cabs, counterbalance rails, channels, tractors, chassi, electrical cabinets, momentum…
Step 2: After all have been placed in the correct position, workers release the plumb and check the exact dimensions and specifications such as the location of the cabin rail, counterweight rail, and floor door. ,.
Step 3: Install the rail, mount the rail in the order from bottom to top, the rails will be fixed with the bass that holds the rail linked with the concrete momentum around the hole. During mounting using the working floor, the floor is raised and lowered by 1 pallet.
Step 4: Install the chassis of the cabin and the counterweight frame. Now use the cabin floor as a working floor. Tractor and chassi are put into exact position. Install the load cable to link the car and the counterweight frame, add poid cast iron to the counterweight frame to balance the load of the ladder, install the governor.
Step 5: Use the tractor, turn hand to bring the cabin frame up and down, install the floor door and cover the floor door, the sequence of mounting from the top down.
Step 6: After completing the floor door, inform Party A to proceed with the construction of the door with the guidance of Party B. The control panel boxes on the doorstep are located during the construction process.
Step 7: Clean the entire pit hole, install the cabin wall and ceiling, the cabin door transmitter, and the cabin door. Raise the ladder to check the correct specifications and add a counterweight poid to balance the load with the cabin.
Step 8: Cleaning and final inspection, then hand over to the power unit.
Step 9: The power unit will be wired to connect the electrical cabinet, the tractor, the electrical wiring system along the hole, the electric wire according to the cabin. Installation of cabin panel, floor panel. Checking of all connected electrical systems is complete. Switch on and run the test at a slow speed for checking and calibration.
Step 10: After checking and adjusting all the specifications as well as the load balance, the ladder is run with no load and then running with full load to adjust the floor balance when stopping. The ladder is run for inspection for 03 days, then full cleaning is carried out to prepare for the inspection.
Step 11: Party B will notify Party A to conduct the acceptance in writing 03 days in advance. After handing over, Party B is responsible for guiding and training Party A’s staff on how to use and rescue the ladder.
The post The process of installing the elevator according to strict standards appeared first on Thang Máy Đông Dương.
]]>The post Recruitment appeared first on Thang Máy Đông Dương.
]]>At Dong Duong Elevator, we know that greatness is earned every day and the passion, commitment, and hard work of our employees make our continued success possible. We lead our industry because our employees do more than meet our customers’ needs today.
We go through great lengths to hire and develop the best people, and we offer a supportive environment where employees are motivated and empowered to perform at their full potential. Today, we continue pushing the boundaries of what’s possible to thrive in upcoming peaks.
Why should you choose to join Dong Duong Elevator team
Our success is indispensable for professional talents, staff, and technicians. Accompanying Dong Duong Elevator Company, you not only get the basic benefits of working but also work in a professional environment, well trained in the elevator industry, and colleagues are always friendly and ready to assist when in difficulty.
With the growing trend of the elevator industry in Vietnam, Domng Duong Elevator Company commits to always create more opportunities for human resources to constantly improve and develop.
Labor benefits: Dynamic environment, Labor policy and Salary
WORK ENVIRONMENT
Dong Duong Elevator Company pays attention to the working conditions of employees: we try to create a comfortable, airy, clean workplace; provide adequate machinery, necessary working equipment; equip employees with uniforms as well as full personal protective equipment for employees working at the site.
A dynamic and professional working environment, always creating conditions for each employee to have the opportunity to assert themselves and promote their full capabilities. At work, there is always the guidance of superiors, the coordination of colleagues and related departments in the spirit of the common development of the Company.
LABOR POLICY
Dong Duong Elevator Company operates 44 hours / week working regime.
SALARY
Salary policy is built on the basis of the assigned work and the performance of the job.
SOCIAL INSURANCE
Dong Duong Elevator Company implements social insurance and medical insurance for employees in accordance with current regulations. Maternity
TRAINING
In order to build staff of knowledgeable work, with good expertise and professional ethics, every year, Dong Duong Elevator Company develops a training plan in accordance with the Company’s development strategy.
The post Recruitment appeared first on Thang Máy Đông Dương.
]]>The post Catalogue 2021 appeared first on Thang Máy Đông Dương.
]]>The post Catalogue 2021 appeared first on Thang Máy Đông Dương.
]]>The post Customer care appeared first on Thang Máy Đông Dương.
]]>Elevator consultants have experience in their field and have gained this level of expertise by working directly in the vertical transportation industry for many years. They know the ins and outs of the industry and provide you an affordable method. An elevator consultant can save you from making mistakes that could cost significantly and allow you to have work performed the right way the first time.
CONSTRUCTION PROJECT
Elevator consultants for construction projects are typically required by either the owner, or the general contract. An elevator consultant can put together a scope for construction, provide available options for unique building designs, evaluate the process during or after installation, or testing of the equipment.
DESIGN
Every solution and every project design are custom-made based on the characteristics of your home, your project and the understanding of your needs and desires.
A dedicated staff can develop customized projects, compact solutions and satisfy your taste in interior design trends by offering customizations in colours and materials.
We provide solutions because we know how important a solution that adapts to your needs and your environment is.
The post Customer care appeared first on Thang Máy Đông Dương.
]]>The post Elevator renovation appeared first on Thang Máy Đông Dương.
]]>Some items need to be double – checked and evaluate:
1/ Brake
2/ Speed Governor
3/ Cable
4/ Control board
5/ Tractor
6/ Car door and Landing door
7/ Guide rail
Problems of a long – time using elevator
– There has vibration when running, jerky start, floor stopping not exact, moving with sound.
– Slow closing door with vibration and sound.
– Sometimes stops with sudden, could be trapped inside.
– Unsteady operation because of worn out electronics and controller.
– Stained mark on the metal surface of car and landing door causes bad look. Blurred light inside cabin.
Elevator Upgrade Benefits
– Upgrade helps better operation: faster and softer.
– Upgrades controlling system by new technology with more features, saving energy.
– The more convenient elevator, the more advantage business.
– In comparison with dismounting and installing the whole new lift, upgrading brings more efficiency and much less cost.
COME WITH US, YOU CAN GET
– Practical consulting, cost cutting
When ordered, we would be in a process of survey and re – examine the elevator condition, and from that on, creating alternatives for clients such as damaged equipment replacing good condition device adjustment in order to not even limit unwanted cost for customers but also help the elevator safe and steady operation.
Some Upgrade Packages are also conducted by demands and restricted cost of clients.
– Devices and accessories
The replacing devices or electronics are origins. Equipment is selected via reliability assessment.
– Warranty
A long – term warranty for all of replacing electronics, commitment about being alongside of customers as using product coming from Dong Duong.
The post Elevator renovation appeared first on Thang Máy Đông Dương.
]]>